Example builds

Pick a starting point for your plan, then customize. Each example loads the same wiring diagram you'll see in the planner — usage, generation, and hardware are already wired up so you can see how the pieces fit together before you change a thing.

Example Build

Weekender

Friday-to-Sunday trips — small fridge, single-burner cooking, laptop on the table, diesel heater for shoulder seasons.

758 Wh/day1 battery · 400W solar · 50A DC-DC$1,652 components
Beta

Educational estimates only — not a substitute for a licensed electrician. Verify against ABYC E-11 and manufacturer specs before installing. See full disclaimer.

Loading diagram…
Read-only preview — your edits won't be saved here.
Customize in the planner
Example Build

Overlander

Drive most days — alternator does the work. Diesel heat for cold nights, Starlink Mini at camp, single-burner cooking.

1,218 Wh/day1 battery · 200W solar · 60A DC-DC$1,470 components
Beta

Educational estimates only — not a substitute for a licensed electrician. Verify against ABYC E-11 and manufacturer specs before installing. See full disclaimer.

Loading diagram…
Read-only preview — your edits won't be saved here.
Customize in the planner
Example Build

Couple traveler

Off-grid couple on long trips — moderate cooking, fridge, diesel heat, Starlink for keeping in touch. No AC, no work-from-van — chases mild weather and dispersed camps.

1,562 Wh/day2 batteries · 600W solar · 50A DC-DC$2,417 components
Beta

Educational estimates only — not a substitute for a licensed electrician. Verify against ABYC E-11 and manufacturer specs before installing. See full disclaimer.

Loading diagram…
Read-only preview — your edits won't be saved here.
Customize in the planner
Example Build

Family / multi-bunk

Two adults + kids in a high-roof extended van — off-grid camping, big fridge, two laptops, TV for rainy evenings. Heads north in summer, no AC.

2,654 Wh/day2 batteries · 800W solar · 50A DC-DC$2,717 components
Beta

Educational estimates only — not a substitute for a licensed electrician. Verify against ABYC E-11 and manufacturer specs before installing. See full disclaimer.

Loading diagram…
Read-only preview — your edits won't be saved here.
Customize in the planner
Example Build

Mobile office / full-timer

Off-grid for weeks at a time — induction cooking, Starlink for work, diesel heat. Migrates with the weather, so no AC needed.

2,274 Wh/day2 batteries · 800W solar · 60A DC-DC$2,735 components
Beta

Educational estimates only — not a substitute for a licensed electrician. Verify against ABYC E-11 and manufacturer specs before installing. See full disclaimer.

Loading diagram…
Read-only preview — your edits won't be saved here.
Customize in the planner
Example Build

Sunbelt / desert full-timer

Anchored in hot regions — heavy 12V AC is the headline load. Solar maxed out, 3-pack bank for multi-day autonomy, large fridge, parked for weeks at a time. Pushes 12V to its real ceiling — anything heavier and you want 24V/48V.

4,858 Wh/day3 batteries · 1000W solar · 60A DC-DC + heavy AC$3,410 components
Beta

Educational estimates only — not a substitute for a licensed electrician. Verify against ABYC E-11 and manufacturer specs before installing. See full disclaimer.

Loading diagram…
Read-only preview — your edits won't be saved here.
Customize in the planner